A monitoring plan in BEE format and a data system that measures, records and controls your numbers.

The problem, in your words

“We have meters and records, but we cannot show a verifier a clear chain from the meter to the reported number.”

What we do

  • Design the metering and measurement hierarchy for the plant.
  • Set out fuel sampling and analysis procedures.
  • Arrange laboratory analysis through NABL-accredited labs.
  • Map the data flow from meter to report, with an owner at each step.
  • Define QA/QC checks, roles and responsibilities.

What you receive

  • ✓Monitoring plan in BEE format
  • ✓Metering and measurement map
  • ✓Fuel sampling and analysis procedure
  • ✓NABL laboratory arrangements
  • ✓Data flow and QA/QC procedure
  • ✓Roles and responsibilities

Frequently asked questions

How often must fuel be sampled?+

The procedure requires solid fuel to be sampled every 20,000 tonnes and at least monthly, and gaseous fuel at least weekly.

Must the laboratory be accredited?+

Analysis goes through NABL-accredited laboratories, and internal labs have accreditation requirements of their own.

When is the monitoring plan due?+

Our annual calendar lists the monitoring plan on 30 June. Always confirm the date against the latest official notification.