
Service 03
Monitoring Plan & MRV Systems
A monitoring plan in BEE format and a data system that measures, records and controls your numbers.
The problem, in your words
“We have meters and records, but we cannot show a verifier a clear chain from the meter to the reported number.”
What we do
- Design the metering and measurement hierarchy for the plant.
- Set out fuel sampling and analysis procedures.
- Arrange laboratory analysis through NABL-accredited labs.
- Map the data flow from meter to report, with an owner at each step.
- Define QA/QC checks, roles and responsibilities.
What you receive
- ✓Monitoring plan in BEE format
- ✓Metering and measurement map
- ✓Fuel sampling and analysis procedure
- ✓NABL laboratory arrangements
- ✓Data flow and QA/QC procedure
- ✓Roles and responsibilities
Frequently asked questions
How often must fuel be sampled?+
The procedure requires solid fuel to be sampled every 20,000 tonnes and at least monthly, and gaseous fuel at least weekly.
Must the laboratory be accredited?+
Analysis goes through NABL-accredited laboratories, and internal labs have accreditation requirements of their own.
When is the monitoring plan due?+
Our annual calendar lists the monitoring plan on 30 June. Always confirm the date against the latest official notification.